Darkroom Build

Building my darkroom.
Read More
  • Getting started - September 2021

    Getting started - September 2021

    I decided to turn a storage room into a darkroom. I've been meaning to do this for over 10 years but never got around to it. I decided that this would be a good project to work on during the lockdown. The room measures 6' x 4'6" so I should be able to put in two 2'x4' tables.

  • <h2>Cleaned out the storage room.</h2>
Still have a chest freezer that I don't know what to do with.

    Cleaned out the storage room.

    Still have a chest freezer that I don't know what to do with.

  • <h2>Removed the door.</h2>

    Removed the door.

    20210905110603

  • Building the Tables

    Building the Tables

    Patched and resurfaced an old 2'x4' desktop that I had lying around. Using the chest freezer as a work bench for now.

    20210905110630

  • <h2>New flooring</h2>
Testing out some foam flooring over the linoleum. This is the type of flooring that you see in exercise rooms to protected the floor from heavy weights. It's much nicer to to stand on than the linoleum. Also found a 20"x48" board that I could use for the second table top.

    New flooring

    Testing out some foam flooring over the linoleum. This is the type of flooring that you see in exercise rooms to protected the floor from heavy weights. It's much nicer to to stand on than the linoleum. Also found a 20"x48" board that I could use for the second table top.

    20210906121256

  • Resurfaced the 2'x4' table top with laminate.

    Resurfaced the 2'x4' table top with laminate.

  • <h2>Construction</h2>
Building legs for the table. The wood was recycled from an old Ikea bed.

    Construction

    Building legs for the table. The wood was recycled from an old Ikea bed.

  • Legs for one of the tables.

    Legs for one of the tables.

    20210928202724

  • <h2>Painting - October 2021</h2>
Painting the legs.

    Painting - October 2021

    Painting the legs.

  • Painting the other parts of the table.

    Painting the other parts of the table.

    20211002154917

  • Assembly - October 2021

    Assembly - October 2021

    Assembling the wet side table. Also put up a backspash along the walls.

    20211003130159

  • Almost finished the wetside table. Still need to install the middle shelf and the backsplash.

    Almost finished the wetside table. Still need to install the middle shelf and the backsplash.

    20211003151106

  • Painting the legs for the second table.

    Painting the legs for the second table.

    20211009162321

  • Installed the backsplash on the wetside table.

    Installed the backsplash on the wetside table.

    20211011104849

  • Wetside table almost finished. Still need to install the shelf that goes below the table top.

    Wetside table almost finished. Still need to install the shelf that goes below the table top.

    20211011105033

  • Assembling the dryside table.

    Assembling the dryside table.

    20211011110809

  • Installed shelf on the wetside table. Dryside table is almost finished. I used the 20"x48" board I had. I would later replace it with a wider surface. It turned out to be too narrow for the enlarger stand.

    Installed shelf on the wetside table. Dryside table is almost finished. I used the 20"x48" board I had. I would later replace it with a wider surface. It turned out to be too narrow for the enlarger stand.

  • Building the Ventilation Housing - October 2021

    Building the Ventilation Housing - October 2021

    It took me a long time to figure out how to do the ventilation. I decided on an inline fan mounted in the doorway in a light tight housing. Laying out dado lines.

    20211023205218

  • Cut all the pieces for the housing.

    Cut all the pieces for the housing.

    20211023205311

  • The top and bottom of the housing after routing the dados.

    The top and bottom of the housing after routing the dados.

    20211030173821

  • The front and back panels after cutting the vent holes.

    The front and back panels after cutting the vent holes.

    20211030173909

  • Assembling the Ventilation Housing - November 2021

    Assembling the Ventilation Housing - November 2021

    Spray painted the interior surfaces black. On the left is a 95 cfm inline fan to vent air out of the darkroom. On the right are light tight baffles for the air intake. The center section is empty and will be covered over. I may use it to house a second fan or a swamp cooler in the future.

    20211106150656

  • New Enlarger - November 2021

    New Enlarger - November 2021

    The reason why I started the darkroom build in the first place. In March 2021 I backed the Kickstarter campaign for Intrepid Camera's Compact Enlarger. At first I was going to use my bathroom to do prints, but it was too small. I also didn't want to constantly set up and take down the enlarger, so I decided to build a dedicated darkroom.

    20211122163626

  • Installed Ventilation

    Installed Ventilation

    The ventilation housing installed in the doorway. The left vent is the exhaust port and the right vent is the intake. The room is approximately 200 cubic feet, so the 95 cfm fan will replace all the air in the room in a little over two minutes.

    20211127105633

  • Setting up Enlarger

    Setting up Enlarger

    Copy stand with enlarger on the dryside table.

  • <h2>First Print Session - January 2022</h2>
Installed black out curtains in the doorway. The dry side table has a new, wider surface with a rounded corner.

    First Print Session - January 2022

    Installed black out curtains in the doorway. The dry side table has a new, wider surface with a rounded corner.

  • <h2>First prints!</h2>

    First prints!

  • <h2>Work in Progress - March 2022</h2>
Installed a shelf for the chemicals and installed an eye wash station in the corner. Also got a roller and tank to do color prints.  All together the build took about 6 months.

    Work in Progress - March 2022

    Installed a shelf for the chemicals and installed an eye wash station in the corner. Also got a roller and tank to do color prints. All together the build took about 6 months.